High reputation Commercial Heat Recovery Unit - AC Motor THC Series Commercial Suspended Energy Recovery Ventilation System(ERVs 600~1300 m3/h) – Holtop Detail:
Good thermal insulation The whole series are intergated with EPS structure, effectively preventing condensation, and improving thermal insulation and saving energy consumption. | |
New primary filter New primary filter is made of aluminium alloy frame and rubber filtration materials with nice appearance and longer service life. | |
Sub-HEPA F9 filter integrated optional Optional sub HEPA F9 filter, particle diameter under 2.5μm can be filtered effectively, IAQ (indoor air quality) will be increased obviously. |
|
New compact structure New airflow channels are to increase heat exchange surface and improve energy recovery efficiency. |
|
Easy maintenance • Regular access door is for maintenance of primary filter, PM2.5 filter and heat exchangers. • Increase two professional access doors for the control and fan maintenance. |
|
Higher efficiency with 3rd generation enthalpy exchanger The 3rd generation enthalpy exchanger is made of the latest nanofiber structure to ensure higher efficiency. The heat exchange materials are mildew resistance and fire retardant. |
Specification:
Product detail pictures:
Related Product Guide:
The key to our success is "Good Product Excellent, Reasonable Rate and Efficient Service" for High reputation Commercial Heat Recovery Unit - AC Motor THC Series Commercial Suspended Energy Recovery Ventilation System(ERVs 600~1300 m3/h) – Holtop , The product will supply to all over the world, such as: Doha , Ecuador , Portugal , We hope to have long-term cooperation relationships with our clients. If you are interested in any of our products, please do not hesitate to send enquiry to us/company name. We ensure that you can be totally satisfied with our best solutions!
By Charlotte from Swedish - 2018.09.23 17:37
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
By Margaret from Poland - 2017.04.08 14:55
Write your message here and send it to us