HOLTOP WON A NUMBER OF PROJECT ORDERS AT THE BEGINNING OF 2022

In the fields of hospitals, public buildings, real estate construction…etc,

Holtop fresh air conditioning system products are trusted by more and more customers, keeping a high growth trend…

 

Sanming First Hospital Ecological New Town Branch Project adopts 1213 units of digital new and exhaust air units and intelligent distributed modules

Sanming First Hospital Ecological New Town Branch, with a total area of about 140 acres, aims to build a regional medical service center, provide diversified and high-quality “medical oxygen services” and promote the high-quality development of the health industry.

三明

 

Wanzhou Three Gorges Emergency Hospital Project adopts 860 units of digital new and exhaust air units and intelligent distributed modules

Wanzhou Three Gorges Emergency Hospital will initially build 300 fixed beds and 700 temporary beds to undertake public health emergency tasks in the northeast area of Chongqing, further enhancing the emergency rescue capability of public health emergencies in the northeast area of Chongqing.

三峡

 

Shaanxi Rongchuang Royal River Chen Yuan Project adopts a total of 2535 sets of Eco-vent pro energy recovery ventilators.

Located in Xianyang High-Tech District, Sunac-Yuhe Chen-yuan are Sunac’s contemporary state-style residences with 80-126 square meters, which are equipped with Holtop Eco-vent pro energy recovery ventilators to further improve the life quality of the owners.

融创

 

Shaanxi Sunac Xinyang eight factory Project adopts 560 sets of Eco-vent pro energy recovery ventilators

Sunac real estate has developed rapidly in a few years in Xianyang, and Xianyang Eight Factory is the eighth project of it, which has opened a new pattern of real estate enterprises in the city with time.

咸阳八厂

 

Shijiazhuang Rongchuang Center adopts 823 sets of Eco-vent pro energy recovery ventilators in the project of Lot 30# and Lot 32#

Shijiazhuang Rongchuang Center is surrounded by rich educational resources, and the overall planning concept is “children’s educational residential area”, which covers health, sports, science, socialization, fun, etc. The Holtop Eco-vent pro energy recovery ventilators protect health.

石家庄

 

Harbin Institute of Space Environment and Material Science Project adopts 15 sets of heat recovery direct expansion constant temperature and humidity units.

The Institute of Space Environment and Materials Research is the construction unit of the National Science Project “Space Ground Simulator”, which is the first national deployment in the northeast region and the only national major science and technology infrastructure project in the field of space science during the “12th Five-Year Plan”.

哈尔滨

Related products: Holtop slim series suspended type energy recovery ventilators

Slim Series Energy Recovery Ventilation System units (ERVs 150~350 m3/h,AC Motor) (holtopglobal.com)

It is a good start of 2022.
Lay a solid foundation for the continuous and stable growth of Holtop Group
Holtop Group will adhere to high standards and requirements, provide users with reliable products and services.