HOLTOP HVAC Cooperated with Mercedes-Benz for Seven Years
Holtop attended the Facilities Open Day Event held by Beijing Mercedes-Benz Automobile Co., Ltd. in November 2018. The theme of the event is to create a green smart factory, to experience the smart technology of the Mercedes-Benz automobile manufacturing plant, to demonstrate the special craftsmanship and facilities contribute to Mercedes-Benz’s high quality automobiles.As a supplier of Mercedes-Benz energy-saving air-conditioning systems, HOLTOP was invited to participate in this open-day event, and showing the cooperation between HOLTOP and Mercedes-Benz for seven years.

 

*The senior leaders of Beijing Mercedes-Benz Auto Co., Ltd. visited the HOLTOP exhibition area and fully affirmed the energy saving effects by HOLTOP products.

 

*The instructor explained in details the wide applications of HOLTOP energy-saving air conditioners in Mercedes-Benz production.

 

For seven years, HOLTOP has tailored a comprehensive air handling solution for precision air temperature and humidity control, cleanliness control, airflow organization, hazardous gas concentration control, vibration noise control and energy recovery for Mercedes-Benz.

*HOLTOP heat recovery air conditioning unit detailed show

 

HOLTOP and Mercedes-Benz seven-year cooperation trip

In 2012, HOLTOP air conditioning system for the Mercedes engine complex plant was put into use.

Power center  & Engine complex plant

 

In 2013, HOLTOP air conditioning system for Mercedes-Benz generator complex plant, power battery equipment workshop put into use.

 

Power battery equipment workshop & Generator complex plant & Power center & Discharge area & Sewage treatment station

 

From 2014 to 2017, the HOLTOP air conditioning system for the welding shop, stamping shop and assembly shop of the Benz NGCC plant was put into use.

 benz ahu (9)

Welding shop & Stamping shop & Assembly shop of the Benz NGCC plant & Moulding shop

 

From 2014 to 2017, the HOLTOP air conditioning system for the Mercedes-Benz MRA plant assembly workshop, welding workshop, painting workshop and complex factory was put into use.

 

Assembly workshop & Welding workshop & Painting workshop & Complex factory 

 

In 2018, HOLTOP comfort air conditioning system for Mercedes-Benz’s new office building was put into use.

 

 

HOLTOP has provided hundreds of heat recovery air handling units for Mercedes-Benz, with more than 10 million cubic meters airflow. Using the core technology of heat recovery to create huge economic value for Mercedes-Benz.

 

Good news again! HOLTOP signs new contract for Mercedes-Benz Battery Factory Project.

On the opening day, HOLTOP and Mercedes-Benz once again signed an air-conditioning system project of “Beijing Benz Battery Factory”, which is a battery factory jointly built by Mercedes-Benz and BAIC. This will become an important part of Mercedes-Benz’s global battery network, laying the foundation for Mercedes-Benz’s transition to zero emissions.