Untranslated
  • facebook
  • linkedin
  • twitter
  • youtube
  • WHATSAPP-
  • instagram
language

Short Lead Time for Modular Air Handing Unit - Holtop Industrial Air Conditioning System Solutions – Holtop

We always believe that one's character decides products' quality, the details decides products' high-quality ,together with the REALISTIC,EFFICIENT AND INNOVATIVE crew spirit for Heat Recovery , ventilation system for hospital , 300cmh ERV , Currently, we are wanting ahead to even bigger cooperation with abroad customers according to mutual positive aspects. Be sure to sense free to contact us for more details.
Short Lead Time for Modular Air Handing Unit - Holtop Industrial Air Conditioning System Solutions – Holtop Detail:

Holtop Industrial Air Conditioning System Solutions

Industrial HVAC Projects Air conditioning system Customize support

1c5a880f6

50U series modular air handling unit

5fceea162

 

50B series combined air handling unit

95fb98ab

 

 

80B series modular air handling unit

 

Holtop industrial AHU (air handling unit industrial air conditioning units)

Type 50B 80B 80C
Structure Frame structure Expose beam
connection
Frame structure Expose beam
connection
Pure panel structure smooth
internal side
Insulation material PU/Rockwool PU/Rockwool Rockwool
Insulation thickness (mm) 50 80 80
Density (kg/m3) ≥45/60-120 ≥45/60-120 60-120
Flame retarded class B1/A B1/A A
Airflow range (m3/h) 10000-280000 20000-320000 100000-320000
Total pressure (Pa) ≤2800 ≤3200 ≤4000
Casing mechanical strength GB14294-2008 GB14294-2008 EN1886-2007 D1
Thermal transmittance EN1886-2007 T2 EN1886-2007 T2 EN1886-2007 T2
Cold bridge EN1886-2007 TB2 EN1886-2007 TB2 EN1886-2007 TB2
Air leakage Smaller than clean room AHU Smaller than clean room AHU EN1886-2007 L1
Comply standard GB GB European

1

Heating Section Coil Heating & Valves Module Spray Section
2 3 4

Product detail pictures:

Short Lead Time for Modular Air Handing Unit -
 Holtop Industrial Air Conditioning System Solutions – Holtop detail pictures

Short Lead Time for Modular Air Handing Unit -
 Holtop Industrial Air Conditioning System Solutions – Holtop detail pictures

Short Lead Time for Modular Air Handing Unit -
 Holtop Industrial Air Conditioning System Solutions – Holtop detail pictures


Related Product Guide:

We're committed to furnishing easy,time-saving and money-saving one-stop purchasing support of consumer for Short Lead Time for Modular Air Handing Unit - Holtop Industrial Air Conditioning System Solutions – Holtop , The product will supply to all over the world, such as: Czech Republic , Kazakhstan , Bangladesh , As a well educated, innovative and energetic staff,we are responsible for all elements of the research, design, manufacturing, sales and distribution. With studying and developing new techniques,we are not only following but also leading the fashion industry. We listen attentively to the feedback from our customers and provide instant communication. You will instantly feel our expertise and attentive service.
  • In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
    5 Stars By Ruth from Melbourne - 2018.09.19 18:37
    We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Denise from Cairo - 2018.06.21 17:11
    Write your message here and send it to us